Work has continued in the catwalks
over the past week. Plywood continues to be replaced by new steel walkways.
Hand railings are also being installed in the light bridge, as shown in
the picture. The openings in the roof for the house lights continue to be
enlarged for the new lights. |
 |
Speaking of bridges, our new loading bridge
has been installed! It will eventually be recieving work lights and a black
paint job. This structure will facilitate adding and removing weights from
the fly system. |
|
Finally, additional, smaller conduits have
been installed. These conduits will contain wiring that will mostly serve
for A/V purposes (video, audio, electrical, etc). The trenches will be refilled
with concrete in the coming days. |
 |