Work has continued in the catwalks over the past week. Plywood continues to be replaced by new steel walkways. Hand railings are also being installed in the light bridge, as shown in the picture. The openings in the roof for the house lights continue to be enlarged for the new lights.
Speaking of bridges, our new loading bridge has been installed! It will eventually be recieving work lights and a black paint job. This structure will facilitate adding and removing weights from the fly system.
Finally, additional, smaller conduits have been installed. These conduits will contain wiring that will mostly serve for A/V purposes (video, audio, electrical, etc). The trenches will be refilled with concrete in the coming days.